Our projects

We invite you to visit our career, some of our most significant projects we were involved up to today.

We help to connect people and places, we help to create new horizons by land, sea and air. We build roads, bridges and tunnels. We work with the certainty that we learn a lot doing and continue to do our best.

Satisfied Customers
+
Finished projects

Finished projects

  • 1997

    North Shopping Matosinhos

  • Train station Ermesinde

    1998 a 1999

  • 1999 a 2001








     

    Extention from 2 to 4 lanes in A1 Carvalhos

    Topographic support on building walls and special engineering projects.

    +
    +
  •  






    Overpass of Perna seca and ribeira de porcão on A2.

    Topographic support and supervison to construction

    +
    +
  • Outlet – Lago Discount – Ribeirão /Famalicão

    2001

  • ISAVE – Instituto Politécnico do Vale do Ave

    Póvoa do Lanhoso

    +
    +





     

  • Businnes center of Celeirós

    Braga

    +
    +





     

  • 2001 a 2003








     

    IC-28 Ponte de Lima / Arcos do Valdevez, Construction of eleven

    overpass with top/bottom movable scaffolding systems.

    +
    +
  • Ponte da Amizade (International bridge Portugal/Galicia)

    built in cantilever with 433m of length

    2002 a 2004

  • 2003






    ISAVE University residence

    Póvoa do Lanhoso, 300 beds

    +
    +
  • IC-25 Paços de Ferreira – Nó da Ermida

    building of fifteen special engineering projects and support on land work over 6 kms

    2003 a 2004

  • 2004 a 2005








     

    Variant to E.N. 13 Mirandela/Valpaços

    construction of four special engineerein projects, bridges over the Rio Torto, Gralheira, Ribeira de Lila and Sucçães five overpasses and fourteen agricultural ways.

    +
    +
  •  






     

    A28 SCUT NORTH COAST

    Construction of three special engineering projects and three overpasses V2, V3 and V4 both prefabricated

  •  






     

    PORTUCEL of Viana do Castelo

    Implementation of a new natural gas cogeneration unit in PORTUCEL of Viana do Castelo.

  • Water Supply Subsystem of S. Jorge

    Implementation of Subsystem Water S. Jorge supply from the northern limit of Viana do Castelo Port to Cavada, intake pipes in Caminha municipality in length of 40 km, Anchor reservoirs and Bristelo

    +
    +








     

    2005 a 2006

  • 2006

    MULTIPARK – Seroa business center

    Paços de Ferreira

  •  






     

    Private resort village manique

    Cascais

    +
    +
  •  

    Oeiras residence urbanization

  •  

    Edifice Rotunda Parking

    Portimão

  •  








     

    Construction of several structures

    Holmes place haelth club, Staples office center, modelo hipermarkets, schools, parking in baiona, worten and so on...

    +
    +
  •  

    Sesimbra Bay – holiday apartments

    Study and quantification of land volumes

  • A17 high-way Marinha Grande

    Mira / Subsection Marinha Grande - Louriçal, topographic support on the construction of current special engineering projects, Liz Bridge, overpass of Varzeas with movable scaffolding systems and formtravellers method.

    Mira / Subsection Louriçal-A41 -Part2, topographic support on the construction of six special engineering projects, Bridge on the River Pranto with two access overpas with movable scaffolding system and formtravellers, , Freixiosa overpass movable scaffolding system and full way at 5km extension.

    +
    +















     

    2005 a 2007

  • 2006 a 2007







     

    Multi system of water supply to the Baixo Cávado and Ave

    Implementation of Multi System Water Supply to the Baixo Cávado and Ave (Subsystem Barcelos) - 2nd phase works including reservoirs

  • Construction of ETAR AGRA II

    2007 a 2008

  • 2008 a 2010

    Águas de Trás os Montes e Alto Douro – ETAR´s Douro Sul

    construction of six ETAR's and their conduct on several villages in Lamego region

  • Cuco Bridge - Barreiralva / Mafra

    bridge constructed by the method of successive advancements

    2008 a 2009

  • Highway AP 53 - Santiago / Ourense

    Topographic support on the construction of the bridge in Barbantiño with formtravellers, Minho River Bridge with movable scaffolding systems , support for the full way, soil-cement placement and floor.

    +
    +









     

     

  • Centro Cultural de Gaia, Mill Milaneza

    extension and upgrading of existing special engineering in EN 108 (Porto and entre os rios), Porto Editora

     

  • 2008 a 2011










     

    Douro Litoral concession, A41

    Picoto (IC2) / Node Chapel (IC25) Section 2 and Section 3.1, preparation and execution of the Covelo overpass (formtravellers), Bustelo everpass ( bottom movable scaffolding systems), Overpass over REFER (prefabricated) six chains artworks, full way in a length of 8 km

    +
    +
  • NASSICA Mindelo –Vila do Conde

    Topographic support on the implementation of roads, general infrastructure, parking for 1600 cars and landscaping






     

     

  •  











     

    CAET XXI highway Transmontana

    Topographic support on the construction of thirty-two special engineering projects, beginning in 2010 and still ongoing.

    Topographic support on the construction of the bridge over the Tua river in Mirandela and Bridge on the Sabor river in Braganca. Both in successive advances method.

    +
    +
  • Variant to EN 101

    Ponte da Barca/Arcos de Valdevez
    Topographic support on the construction of several overpass and special engineering projects.






     

     

  •  






     

    NEW BRIDGE OVER THE LIMA RIVER

    Topographic support on the construction of a bridge by the method of successive advances.

  • MOTORWAY WEST COAST

    IC2 -IC36 node / EN109 node
    IC2 - Variant of Batalha - Azóia node.
    IC9 - EN1 (IC2) / Fatima (A1). We provide topographic support in the construction of forty two special engineering projects and and topographic support in all the way with an extension of 6 km.

    +
    +












     

     

  •  







     

    MARTIFER SOLAR

    Topographical surveys of five fields of 50 hectares for study and planning for photovoltaic plants to build the South side of Tejo river (Montijo), north side also of(Mafra / Loures) and Loulé.

  • BRIDGE OVER THE DÃO RIVER - IP3

    We started in September the topographical support in the construction of the bridge over Dão River. This contract includes the construction of a new bridge and its interchanges of IP3 and demolition of the existing bridge. The bridge will be built by the method of formtravellers

    +
    +









     

     

  •  







     

    EDP - Additional works on Baixo Sabor water barrier

    Overpass EN-315 alfandega da fé / Mogadouro, EN-216 Overpass Mogadouro / Macedo de Cavaleiros in bottom movable scaffolding systems and EN-217 Mogadouro / Morais with bottom movable scaffolding systems.

  • Portugal – Project Rose

    2013

  • 2014

    Mexico – Project Aura Solar

  •  

    Tanzania - A study and survey for solar site

  • UK - Several projects

    2013 a 2015

  • 2013 a 2016

    France - Several projects

  • Jordan - Mafraq Project

    2016

  •  

    Jordan - Project Man'an

  • We will continue to
    expand our work
    worldwide